Case Study
How We Increased Sales by Over 26% In Less Than 2 YearsIntro
How We Increased Sales by Over 26% In Less Than 2 Years
Latest assignment was to improve the output of a manufacturing company in Asia region, which led to a new factory site was built, and was seeking to improve manufacturing systems and performance.
During the assessment and process reviews, a number of areas of change were identified and implemented over the following 24 months.
Details
Taking operational excellence to the next level
Challenge
Although the company was successful the efficiency was low, caused by old machine park and lack of maintenance. Due to growth the human resources had not gotten the right attentions in the introduction and continuous training of the employees.
A new ERP system was introduced, the old data was imported which had data that was not accurate which created a lot of planning issues for material management and production management to be able utilize the capacity correctly.
Solution
Planning and Performance
- A production planning system was developed to enable performance to be measured, and the performance vs plan figures improved from 32% average to 70% within 12 months of introducing the measures and reviewing downtime reasons.
- The capacity across machines was revisited and planning was able to be more correctly planned due to accurate data.
- The costing of products was reviewed to ensure all work was operating at a demanded margin.
- The workforce was re-trained and evaluated which led to a increase efficiency of 20%
Lean & Waste Reduction
- The factory was re-designed to run with one-piece flow to increase the efficiency and reduce the lead-times.
- In line operation of secondary activities was instigated to minimize unnecessary handling.
- Recycling of waste was reviewed, and further materials was able to be introduced, which significantly reduced waste generation, storage and handling.
Standards
- Digital web-based performance & efficiency boards was introduced to provide hourly performance information at a glance.
- 5S was re-introduced to organize and improve efficiency in work areas.
Annual Savings
€450k
Sales increase
26%
efficiency Increase